Representative Offshore Engineering Projects
Provided in the table below is a sample of the types of projects the Offshore Engineering departement performs for it's clients:
Offshore Platforms
| Client |
Project |
Scope |
Services |
| Apache Corporation |
West Cameron 33 "0" |
Free-standing caisson test faciligty in 30-foot water depth. The caisson supports three external and one internal conductor.
|
Project Management
Engineering Support
Procurement
Permitting
|
| Arena Offshore |
Grady: Main Pass 236 "D"
Julio: Main Pass 236 "E"
|
Two four-pile full-facility platforms conducted simultaneously. |
Facility Engineering
Electrical Engineering
Instrument Engineering
Structural Engineering
Detailed Drafting
Procurement
Construction Management
|
| ATP Oil & Gas |
Deepwater Development MinDoc II |
Engineering and detailed design for the topsides of a deepwater floating facility. |
Mechanical Engineering
Structural Engineering
Electrical Engineering
Instrument Engineering
Procurement
Project Controls
|
| Bennett & Associates |
MinDoc II |
Detailed design for hull piping and structural supports. |
Design Coordination
|
| Devon Energy |
Galveston Area 424 "C" |
Full project management and engineering of the decommissioning, removal, modification and relocation of a four-pile platform in 100-foot water depth with a 6" pipeline subsea tie-in. |
Procurement
Permitting
Construction Management
Offshore on-site Inspection
|
| Devon Energy |
Viosca Knoll 213 "A" |
Modification and relocation of existing tripod platform. Modifications to central receiving platform, including compressor additions. Installation of 8" pipeline to central platform. |
Procurement
Permitting
Construction Management
Offshore on-site Inspection
|
| MODEC International |
EnCana's Deep Panuke Nova Scotia, Canada |
Topsides engineering for design competition for MOPU installation offshore, Nova Scotia. Full production / utility systems for manned facility, including amine sweetening, condensate stabilization, gas hydration, gas compression and power generation. |
Front-End Engineering Design
Detailed Design
Procurement
Commissioning
|
| Toreador Resources |
South Akcakoca Sub-Basin |
Field development project. Included the FEED design phase for the addition of three to six offshore test facilities, the 9-mile gathering system and the onshore compression/dehydration/sales facility. The detailed design included the offshore gathering system and onshore facility. Procurement and commissioning were also included in this project scope. |
Front-End Engineering Design
Detailed Design
Procurement
Commissioning
|
| Torp Terminal LP |
Undisclosed GOM Location |
Conceptual study for LNG regasification facility which required 1.4 Bcfd off-loading regas/compression facility, 16,000-hp compression with 40 MW power generation. Services included facility, structural and electrical engineering, drafting and design, and cost estimates. This supported the submittal of the Deepwater Port permit application. |
Conceptual Study
Facility Engineering
Structural Engineering
Electrical Engineering
Drafting and Design
Cost Estimates
Permitting
|
|
Offshore Pipelines
| Client |
Project |
Scope |
Services |
| Arena Offshore |
Main Pass 120 "A" |
2 miles of 6" bulk gas and 2" bi-directional gas lift pipelines from Arena's MP120 "A" Platform to Petro Venture's M120 "CA" Platform
|
Project Management
Engineering
Permitting
Procurement
Inspection
Construction Management
|
| Chevron / Samsung |
Takula, Angola |
6" gas lift pipeline from Tukula GS-M to Takula Fox, 6" LPG pipeline from Cabinda Gas Plant to GIP-FOX, and 24" gas pipeline from GS-PAPA to TGPP. |
Pipeline Engineering
|
| Devon Energy |
Galveston Area 424 "C" |
Decommissioning, removal, modification and relocation of four-pile platform and facility. 12" pipeline to subsea tie-in. |
Project Management
Engineering
Permitting
Procurement
Inspection
Construction Management
|
| Devon Energy |
Viosca Knoll 213 "A" |
Modification and relocation of existing tripod platform. Modifications to central receiving platform, including compressor addition. Installation of 8" pipeline to central platform. |
Project Management
Engineering
Permitting
Procurement
Inspection
Construction Management
|
| Devon Energy |
Mobile Bay 826 |
8" carbon steel pipeline with Hastelloy 825 liner to tie onto Shell's Mobile Bay 113 Fairways Platform. Product contained 2% H2S and 4% CO2 with several directional drills under the Alabama ship channel. |
Project Management
Engineering
Permitting
Procurement
Inspection
Construction Management
|
| Devon Energy |
South Marsh 255 "#2" |
Replace 1,500 feet of corroded pipeline. Upgrade pipeline system to allow line pigging. |
Project Management
Facility Engineering
Permitting
Procurement
Inspection
Construction Management
|
| Toreador Resources |
South Alaska Sub-Basin |
60 miles of 16" gathering system to transport product from three offshore facilities to the onshore production facility |
Project Management
Engineering
Pipeline Drawings
Construction Management
|
Offshore Upgrading Facilities Projects
| Client |
Project |
Scope |
Services |
|
Arena Offshore
|
Grand Isle 78 "A" High Island A547 "B" |
Oil treater and water skimmer replacement and upgrades.
|
Project Management
Facility Engineering
Design Coordination
Procurement
Construction Management
Fabrication Inspection
|
| Devon Energy |
Eugene Island 330 "A", "B", "C", and "D" |
Field recovery project resulting from Hurricane Rita damage. Full revamp of oil-treating and oil-transfer facilities at EI330 "D"; compressor, separation and utilities modifications at EI 330 "C". Pump and sump system modifications at Platforms "A" and "B". Power generation modifications, pipeline modifications throughout the field. |
Project Management
Facility Engineering
Structural Engineering
Pipeline Engineering
Permitting
Procurement
Construction Management
Inspection
|
| Devon Energy |
West Cameron 333 "A" and 108 "A", South Marsh Island 128 "SA2" and 23 "G", East Cameron 334 "B" |
Replacement of deck drain and water skimmer and water-handling equipment upgrades. |
Project Management
Facility Engineering
Design Coordination
Procurement
Fabrication Inspection
Construction Management
|
| Devon Energy |
South Marh Island 128 "A", "B", and "C" |
Field recovery project resulting from Hurricane Rita damage. Major modifications and replacement of production and utility equipment at SM 128 "A" including compression, separation, oil-handling, water-handling and electrical equipment. Addition of compression, water-handling and electrical equipment on SM128 "B" and SM128 "C". |
Project Management
Facility Engineering
Structural Engineering
Permitting
Procurement
Construction Management
Inspection
|
| Energy Resource Technology (ERT) |
South Timbailer 86/63 |
Vent scrubber and compression additions and upgrades to existing equipment. |
Project Management
Facility Engineering
Design Coordination
Construction Management
|
| Noble Energy |
East Breaks 110 |
Compressor addition |
Project Management
Facility Engineering
Design Coordination
|
| W&T Offshore |
South Marsh 28 |
Compressor addition |
Project Management
Facility Engineering
Permitting
|
|
|
|
|
|
 |
|
|
|
|
|
|
|