Galveston
Block 424 "C"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Decommissioning, removal, modification,
and relocation of 4 pile platform and facility. 6" pipeline
to subsea tie-in. Water Depth: 100 ft. Facility Design Rate:
70 mmscfd
|
Project Management, Facility Engineering,
Structural Engineering, Design Coordination, Pipeline Engineering,
Procurement, Permitting, Construction Management, Offshore Onsite
Inspection
|
|
Viosca Knoll
Block 213 "A"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Modification and relocation of existing tripod platform.
Modifications to central receiving platform, including compressor
addition. Installation of 8" pipeline to central platform.
Water Depth: 131 ft. Facility Design Rate: 20 mmscfd
|
Project Management, Facility Engineering, Structural
Engineering, Design Coordination, Pipeline Engineering, Procurement,
Permitting, Construction Management, Fabrication Inspection, Offshore
Onsite Inspection
|
|
Cabinda Block 14 ãBBä
(West Africa)
|
Omega Natchiq
|
Seafastening of platform drilling modules. Transportation
analysis on two (2) barges.
|
Structural Engineering
|
|
Eugene Island Block 330 "B"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Compressor addition to existing platform.
|
Project Management, Facility Engineering, Structural
Deck Modifications, Procurement, Permitting, Construction Management>
|
|
East Cameron Block 33
(Gulf of Mexico)
|
The Houston Exploration Company
|
Engineering design of a temporary caisson and pipeline.
|
Project Management, Facility Engineering, Structural
Deck Modifications, Procurement, Permitting, Construction Management
|
|
High Island Block 140 "A"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Added flowlines for new wells. Replaced precipitator.
|
Project Management, Facility Engineering, Procurement,
Permitting, Construction Management
|
|
Eugene Island Block 330 "A"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Addition of water handling capabilities, including
adding water, skimmer and induced gas flotation cell.
|
Project Management, Facility Engineering, Procurement,
Permitting, Construction Management
|
|
Eugene Island Block 337 "A"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Addition of manifold and line heater for incoming
production pipeline.
|
Project Management, Facility Engineering, Procurement,
Permitting, Construction Management
|
|
West Cameron Block 528 "A"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Replacement of boat landing.
|
Project Management, Facility Engineering, Procurement,
Construction Management, Fabrication Inspection
|
|
West Cameron Block 333 "A" &
Block 108 "A"
South Marsh Block 128 "SA2"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Replacement of deck drain and water skimmer.
|
Project Management, Facility Engineering, Design Coordination,
Procurement, Construction Management, Facility Engineering, Fabrication
Inspection
|
|
Eugene Island Block 528 "A"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Evaluate process system.
|
Offshore Onsite Inspection, Facility Engineering
|
|
Vermillion Block 203 "A"
Galveston Block 144 "A"
Mustang Island Block 807 "A"
(Gulf of Mexico)
|
The Houston Exploration Company
|
Well P&A coordination, platform and pipeline decommissioning.
Platform removal. Site clearance.
|
Project Management, Procurement, Permitting, Construction
Management, Structural Engineering
|
|
South Marsh
Block 255 "#2"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Replace 1,500 ft of corroded pipeline. Upgrade pipeline
system to allow line pigging.
|
Project Management, Facility Engineering, Procurement,
Construction Management, Fabrication Inspection
|
|
Main Pass Block 162 "A"
(Gulf of Mexico)
|
Devon Energy Corporation Anadarko Petroleum Corporation
|
Host Facility Expansion including Condensate Handling
and Compression Facilities Addition.
|
Project Management, PHA Development Support, Field
Development Planning, Compressor Sizing Coordination, Structural
Design Coordination, Pipeline Design, Procurement, Construction Management
|
|
23 Separate Platforms
(Gulf of Mexico)
|
Devon Energy Corporation
|
2003 platform and pipeline decommissioning program.
Platform removal. Site clearance.
|
Project Management, Permitting, Structural Engineering,
Procurement, Construction Management, Offshore Onsite Inspection.
|
|
14 Platforms
(Gulf of Mexico)
|
Devon Energy Corporation
|
2004 platform and pipeline decommissioning program.
Platform removal. Site clearance.
|
Project Management, Permitting, Procurement, Structural
Engineering, Construction Management, Offshore Onsite Inspection
|
|
South Pass Block 65 "B" Eugene
Island Block 330 "A" (Gulf of Mexico)
|
Devon Energy Corporation
|
Pipeline riser repairs.
|
Project Management, Procurement, Construction Management,
Fabrication Inspection
|
|
South Marsh Block 23 "G"
East Cameron Block 334 "B"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Produced water handling equipment upgrades.
|
Project Management, Facility Engineering, Procurement,
Permitting, Construction Management, Fabrication Inspection
|
|
DOT Pipelines
(Gulf of Mexico)
|
Devon Energy Corporation
|
Operations manuals, Integrity Management audit participation.
|
Project Management, Technical Writing
|
|
High Island Block 140 "A"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Replace produced water precipitator.
|
Project Management, Facility Engineering, Procurement,
Permitting, Construction Management, Fabrication Inspection
|
|
Main Pass Block 86 "#1" & "#2"
(Gulf of Mexico)
|
Devon Energy Corporation Anadarko Petroleum Corporation
|
Fabrication and outfitting of satellite platforms.
Modifications to host platform. Design and installation of pipelines.
|
Project Management, Facility Engineering, Procurement,
Permitting, Construction Management, Fabrication Inspection
|
|
South Pass Block 19
(Gulf of Mexico)
|
Devon Energy Corporation
|
Development study for deep gas / mudslide / CO2 /
H2S.
|
Project Management, Facilities Engineering
|
|
Main Pass Block 68
(Gulf of Mexico)
|
Devon Energy Corporation
|
Well protector platform, pipeline, facilities tie-in.
|
Project Management, Facility Engineering, Structural
Engineering Design Coordination, Pipeline Engineering Design Coordination,
Procurement, Permitting, Fabrication Inspection, Construction Management
|
|
East Cameron Block 335 "A"
(Gulf of Mexico)
|
Devon Energy Corporation
|
Facilities upgrade to accommodate high pressure deep
gas wells.
|
Project Management, Facility Engineering, Procurement,
Permitting, Construction Management
|